• Arm Assembly, Aluminum, Oval, 12 ft
• For operators with kill switch built after June 2017
• Includes LED light strip with UV stabilized cover and bumper
• For StrongArmPark DC | StrongArm 14F
• Note: Mounting bracket and harness not included
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Arm Assembly, Aluminum, Oval, 14 ft
• For operators with kill switch built after June 2017
• Includes LED light strip with UV stabilized cover and bumper
• For StrongArmPark DC | StrongArm 14F
• Note: Mounting bracket and harness not included
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Install Straps and Hardware Kit
• Lifting straps, connector links, and eyebolts for lifting/maneuvering the chassis and wedge plate assembly during installation
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Articulating arm assembly with bumper and bracket
• Vehicle clearance from base of operator to bottom bumper side of arm is 8 ft.
• Overhead height (total) is 8.5 ft.
• Overall arm (lane) length is 10 ft.
• Note: Contains WedgeSmart DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Articulating arm assembly with bumper and bracket
• Vehicle clearance from base of operator to bottom bumper side of arm is 7 ft.
• Overhead height (total) is 7.5 ft.
• Overall arm (lane) length is 8 ft.
• Note: Contains StrongArmPark DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Red LED light strand for 12 ft aluminum oval barrier arm
• For StrongArmPark DC | StrongArm 14F
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Red LED light strand for 14 ft aluminum oval barrier arm
• For StrongArmPark DC | StrongArm 14F
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Articulating arm assembly with bumper and bracket
• Vehicle clearance from base of operator to bottom bumper side of arm is 9 ft.
• Overhead height (total) is 9.5 ft.
• Overall arm (lane) length is 10 ft.
• Note: Contains WedgeSmart DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Articulating arm assembly with bumper and bracket
• Vehicle clearance from base of operator to bottom bumper side of arm is 7 ft.
• Overhead height (total) is 7.5 ft.
• Overall arm (lane) length is 8 ft.
• Note: Contains WedgeSmart DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Arm Assembly, Articulating, Lighted, 8 ft Vehicle Clearance
• Includes LED light strip with UV stabilized cover and bumper
• Vehicle clearance from base of operator to bottom bumper side of arm is 8 ft.
• Overhead height (total) is 8.5 ft.
• Overall arm (lane) length is 10 ft.
• Note: Contains StrongArmPark DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Arm Assembly, Articulating, Lighted, 7 ft Vehicle Clearance
• Includes LED light strip with UV stabilized cover and bumper
• Vehicle clearance from base of operator to bottom bumper side of arm is 7 ft.
• Overhead height (total) is 7.5 ft.
• Overall arm (lane) length is 8 ft.
• Note: Contains StrongArmPark DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Arm Assembly, Articulating, Lighted, 9 ft Vehicle Clearance
• Includes LED light strip with UV stabilized cover and bumper
• Vehicle clearance from base of operator to bottom bumper side of arm is 9 ft.
• Overhead height (total) is 9.5 ft.
• Overall arm (lane) length is 10 ft.
• Note: Contains StrongArmPark DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Arm Assembly, Articulating, Lighted, 9 ft Vehicle Clearance
• Includes LED light strip with UV stabilized cover and bumper
• Vehicle clearance from base of operator to bottom bumper side of arm is 9 ft.
• Overhead height (total) is 9.5 ft.
• Overall arm (lane) length is 10 ft.
• Note: Contains WedgeSmart DC specific chassis bracket
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Bushings and Pins Replacement Kit for 3 Hinges
• Includes bushings, pins, and spring pins for 3 hinges
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
• Bushings and Pins Replacement Kit for 4 Hinges
• Includes bushings, pins, and spring pins for 4 hinges
• 3-4 Week Lead Time
• No Additional Tariff FeesSee More Details
@ Copyright 2021 Gate Depot @ Martrano Enterprises, LLC All rights reserved. No part of this site can be reproduced in any form or by any means, mechanical or electronic, without the prior written consent of Gate Depot