FAAC
-
FAAC 428436 S Bracket & Balancing SpringGD# FAC-428436 MFR# 428436• S Bracket & Balancing Spring
• For B680H Automatic Barrier Operator
• 3-5 Day Lead Time See More Details$262.50 -
FAAC 428437 L Bracket & Balancing SpringGD# FAC-428437 MFR# 428437• L Bracket & Balancing Spring
• For B680H Automatic Barrier Operator
• 3-5 Day Lead Time See More Details$507.95 -
FAAC 428616 L CouplingGD# FAC-428616 MFR# 428616• L Coupling for B680H Modular L Arm Installations
• 3-5 Day Lead Time See More Details$67.75 -
FAAC 63003452 Control BoardGD# FAC-63003452 MFR# 63003452$650.95
-
FAAC 401069 Anti-Vandal ValveGD# FAC-401069 MFR# 401069• For B680H Barrier Arm Operator
• Protects the hydraulic system if the barrier arm is forced
• 3-5 Day Lead Time See More Details$295.75 -
FAAC 401051 Anti-Panic Unit 230VGD# FAC-401051 MFR# 401051• For manual opening of the barrier arm in the event of a power failure
• 3-5 Day Lead Time See More Details$877.65 -
FAAC 390084 Bollard Release KeyGD# FAC-390084 MFR# 390084• Bollard Release Key
• Includes 5 Keyes
• For J200SA & J275SA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$84.25 -
FAAC 1161001 Pit - J275/600 BollardGD# FAC-1161001 MFR# 1161001• Installation Pit
• Use with 1161011 for J275/800 Bollard
• All Products Require an 8-12 Week Lead Time See More Details$896.00 -
FAAC 1161011 Pit Extension - J275/800 BollardGD# FAC-1161011 MFR# 1161011• Installation Pit Extension
• Use with 1161001 for J275/800 Bollard
• All Products Require an 8-12 Week Lead Time See More Details$175.50 -
FAAC 2680 VEK MNE1-R24-B Loop DetectorGD# FAC-2680 MFR# 2680• Power supply 10-30 V AC/DC max 1 W
• Relay outputs max 2A 230 VAC
• 11 pins circular connector
• Automatic adjustment of the operating frequency for best performance
• Self setting at power-up
• Loop fault signal
• Operating ambient temperature -35°F to +158°F (-37°C to +70°C)
• 3-5 Day Lead Time See More Details$133.50 -
FAAC 1041001577 S450H CBAC Secondary Operator w/ Hydraulic Locking & Arctic OilGD# FAC-1041001577 MFR# 1041001577• Secondary with Hydraulic Locking and Arctic Oil
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,259.00 -
FAAC 1041011577 S450H SB Secondary Operator w/Arctic OilGD# FAC-1041011577 MFR# 1041011577• Secondary w/Arctic Oil
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,259.00 -
FAAC 104200177 422 CBAC Secondary Operator - 230VAC w/Arctic OilGD# FAC-104200177 MFR# 104200177• 230V w/Arctic Oil
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,245.00 -
FAAC 1042001277 422 CBAC Secondary Operator - 115VAC w/Arctic OilGD# FAC-1042001277 MFR# 1042001277• 115V w/Arctic Oil
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,245.00 -
FAAC 1042011677 400 CBAC Secondary Operator - Standard / 230VAC w/Arctic OilGD# FAC-1042011677 MFR# 1042011677• 230V w/Arctic Oil
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,369.00 -
FAAC 1042011577 400 CBAC Secondary Operator - Standard / 115VAC w/Arctic OilGD# FAC-1042011577 MFR# 1042011577• 115V w/Arctic Oil
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,369.00 -
FAAC 104202177 400 CBAC-EG Secondary Operator - Extended / 230VAC w/Arctic OilGD# FAC-104202177 MFR# 104202177• 230V w/Arctic Oil
• Normal swing speed
• Extended Geometry (longer arm)
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,605.00 -
FAAC 1042021277 400 CBAC-EG Secondary Operator - Extended / 115VAC w/Arctic OilGD# FAC-1042021277 MFR# 1042021277• 115V w/Arctic Oil
• Normal swing speed
• Extended Geometry (longer arm)
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,605.00 -
FAAC 104207177 400 CBACR Secondary Operator - Rapid / 230VAC w/Arctic OilGD# FAC-104207177 MFR# 104207177• 230V w/Arctic Oil
• Hydraulic locking open & closed
• Rapid swing speed
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,500.00 -
FAAC 1042071277 400 CBACR Secondary Operator - 115VAC w/Arctic OilGD# FAC-1042071277 MFR# 1042071277• 115V w/Arctic Oil
• Hydraulic locking open & closed
• Rapid swing speed
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$1,500.00 -
FAAC 104468177 402 CBC Secondary Operator - 230VAC w/Arctic OilGD# FAC-104468177 MFR# 104468177• 230V w/Arctic Oil
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$985.00 -
FAAC 104468277 402 CBC Secondary Operator - 115VAC w/Arctic OilGD# FAC-104468277 MFR# 104468277• 115V w/Arctic Oil
• Make the single kit into a master/slave, or to order replacement operator
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$985.00 -
FAAC 63000596 Motor - 24VDCGD# FAC-63000596 MFR# 63000596• 24 VDC Motor for FAAC 390
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$301.50 -
FAAC 714019 Oil - 1 QuartGD# FAC-714019 MFR# 714019$27.00
-
FAAC 63000315 Seal - Internal Front FlangeGD# FAC-63000315 MFR# 63000315• Internal Front Flange Seal 400 CBAC / S450H CBAC
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$15.40
























