Doorking
-
DoorKing 1200-039 Sealed Bearing Hinge - 3,000 LbsGD# DKS-1200-039 MFR# 1200-039• 3,000 Lbs Per Pair
• Sold Individually - Requires Two Per Gate (Top, Bottom)
• Designed For Use w / Round or Square Gate Frames
• Mounting Bracket & Hardware Included
• 4.00" x 3.75"
• 3-5 Day Lead Time See More Details$140.75 -
DoorKing 1203-084 Torsion Rod AssemblyGD# DKS-1203-084 MFR# 1203-084• Counter?balances uphill swing gates
• Includes top bracket, bottom bracket and one (1) torsion rod
• Use P/N 2600-299 for additional torsion rods
• Up to five (5) additional torsion rods can be added
• 3-5 Day Lead Time See More Details$270.50 -
DoorKing 1601-154 Heater Kit - 115 VACGD# DKS-1601-154 MFR# 1601-154• 120 VAC
• Use if temperature routinely falls below 10°F (12°C)
• For 1601-480 / 1601-481
• 3-5 Day Lead Time See More Details$359.00 -
DoorKing 1601-195 Heater Kit - 115VAC / 9210 OnlyGD# DKS-1601-195 MFR# 1601-195• 115VAC
• Use if temperature routinely falls below 10°F (12°C)
• Compatible with: 9210
• 3-5 Day Lead Time See More Details$720.00 -
DoorKing 1601-197 Heater Kit - 208/230VACGD# DKS-1601-197 MFR# 1601-197• 208/230 VAC
• Use if temperature routinely falls below 10°F (12°C)
• Compatible with: 6300, 6500, 6524*, 6550, 9000, 9024*, 9150, 9210, 9220, 9230, 9235, 9240
• *Heater is only active when AC source power is present
• 3-5 Day Lead Time See More Details$720.00 -
DoorKing 1601-198 Heater Kit - 460VACGD# DKS-1601-198 MFR# 1601-198• 460 VAC
• Use if temperature routinely falls below 10°F (12°C)
• Compatible with: 9000, 9150, 6300, 6500, 6550
• 3-5 Day Lead Time See More Details$720.00 -
DoorKing 2600-263 Post Mount Hardware KitGD# DKS-2600-263 MFR# 2600-263• Post Mount, Arms & Hardware Kit
• For 6300 Operators
• Hardware Kit Must Be Ordered For New Installations
• Order Two For Dual Gates
• 3-5 Day Lead Time See More Details$623.00 -
DoorKing 2600-264 Pad Mount Hardware KitGD# DKS-2600-264 MFR# 2600-264• Pad Mount, Arms & Hardware Kit
• For 6300 Operators
• Hardware Kit Must Be Ordered For New Installations
• Order Two For Dual Gates
• 3-5 Day Lead Time See More Details$530.00 -
DoorKing 2600-266 High Voltage KitGD# DKS-2600-266 MFR# 2600-266• Required for voltages greater than 115 VAC
• 3-5 Day Lead Time See More Details$477.25 -
DoorKing 2600-299 Torsion Rod OnlyGD# DKS-2600-299 MFR# 2600-299$102.00
-
DoorKing 2600-418 Steel Base PlateGD# DKS-2600-418 MFR# 2600-418• Steel Base Plate
• Use to Post Mount Operator
• Posts Not Included
• For 9050 / 9100
• 3-5 Day Lead Time See More Details$77.00 -
DoorKing 2600-495 Steel Base PlateGD# DKS-2600-495 MFR# 2600-495• Steel Base Plate
• Use to Post Mount Operator
• Posts Not Included
• For 9150
• 3-5 Day Lead Time See More Details$261.75 -
DoorKing 2600-664 Concrete Base PlateGD# DKS-2600-664 MFR# 2600-664• For Mounting 6050 & 6100 Post Mount Operators onto an Existing Concrete Pad
• 3-5 Day Lead Time See More Details$284.75 -
DoorKing 2600-671 Pad Mount Hardware KitGD# DKS-2600-671 MFR# 2600-671• Pad Mount, Arms & Hardware Kit
• For 6050 & 6100 Operators
• Hardware Kit Must Be Ordered For New Installations
• Order Two For Dual Gates
• 3-5 Day Lead Time See More Details$411.75 -
DoorKing 2600-674 Post Mount Hardware KitGD# DKS-2600-674 MFR# 2600-674• Post Mount, Arms & Hardware Kit
• For 6050 & 6100 Operators
• Hardware Kit Must Be Ordered For New Installations
• Order Two For Dual Gates
• 3-5 Day Lead Time See More Details$337.75 -
DoorKing 2600-862 Fail-Secure Lock KitGD# DKS-2600-862 MFR# 2600-862• Changes Operator from Fail-Safe to Fail-Secure
• Includes Keyed Release to Open Gate Upon Power Outage
• For 9050 & 9100 Models
• 3-5 Day Lead Time See More Details$33.75 -
DoorKing 2600-865 Fail-Secure Lock KitGD# DKS-2600-865 MFR# 2600-865• Changes Operator from Fail-Safe to Fail-Secure
• Includes Keyed Release to Open Gate Upon Power Outage
• For 9150 Model
• 3-5 Day Lead Time See More Details$35.75 -
DoorKing 2600-961 Chain Link Gate BracketGD# DKS-2600-961 MFR# 2600-961• Includes 5/16" Galvanized Steel L Bracket, Stainless Steel U-Bolts & Hardware
• Two Required per Gate
• 3-5 Day Lead Time See More Details$93.75 -
DoorKing 2600-970 Base Plate Stop BracketGD# DKS-2600-970 MFR# 2600-970• Use With 2600-481 & 2600-495 Base Plates
• Creates A Physical Stop for Post Mounted Operator
• 3-5 Day Lead Time See More Details$55.75 -
DoorKing 2601-270 Chain Tray KitGD# DKS-2601-270 MFR# 2601-270• 10 ft. Chain Tray Kit
• Includes 10 ft. rail, mounting brackets, and hardware
• 9200-135 Heavy Duty Mounting Pedestal required for use w/ 9210 / 9220
• 3-5 Day Lead Time See More Details$416.00 -
DoorKing 4001-110 Control BoxGD# DKS-4001-110 MFR# 4001-110• Replacement Rain Resistant Enclosure
• Designed to Accept 4502 Control Board & Plug-In Loop Detectors (Not Included)
• 3-5 Day Lead Time See More Details$222.00 -
DoorKing 6500-490 Uphill Arm Pivot AssemblyGD# DKS-6500-490 MFR# 6500-490• Use when gate opens on an uphill or downhill slope
• For 6050, 6100, 6300, and 6500 operators
• Should be used with 1203-084 Torsion Rod Assembly
• 3-5 Day Lead Time See More Details$185.75 -
DoorKing 9200-135 Slide Gate Pedestal MountGD# DKS-9200-135 MFR# 9200-135• Heavy Duty
• Recommended for gates over 30-feet to allow use of chain support rail
• Required for gates weighing over 2000 Lb.
• Optional for 9210 / 9220
• Included w/ 9230 / 9235 / 9240
• 3-5 Day Lead Time See More Details$1,055.00 -
DoorKing 1603-222 Traffic Light w/ 35" Mounting PostGD# DKS-1603-222 MFR# 1603-222• Traffic Signal for DK 1603
• Includes 35" Mounting Post & Hardware for DK 1603
• Red / green signal operates in sync with operator
• 8-inch lenses
• Energy efficient LED bulbs
• 1 Year Limited Manufacturer Warranty
• 3-5 Day Lead Time See More Details$742.00 -
DoorKing 1615-081 Warning Sign - Automated Spike SystemsGD# DKS-1615-081 MFR# 1615-081• Use With Automated Spike Systems (DK 1603)
• Light sensor for automatic operation
• Energy efficient LED bulbs
• Built-in LED flood lamp for spike illumination
• Keyed on/off override switch
• 5-Year Manufacturer Warranty
• 3-5 Day Lead Time See More Details$831.00
























