All Products
-
FAAC 428090 Barrier Arm - Aluminum - Rectangular / 12' 6"GD# FAC-428090 MFR# 428090• Lane Opening Width of 12 Ft.
• For FAAC B614
• 3-5 Day Lead Time
• Restock Fee May Apply to Returned Products See More Details$201.50 -
FAAC 428137 Articulated Beam KitGD# FAC-428137 MFR# 428137• For Low Overhead Clearance Applications
• 10' Ceiling Height Maximum
• Order with Rectangular Aluminum Beam
• Call to Complete Order
• 3-5 Day Lead Time See More Details$580.00 -
LiftMaster K65-1208 Barrier Arm - Wishbone Wood / 24'GD# LFM-k65-1208 MFR# K65-1208• 24' x 3/4" Wood Wishbone Arm
• Black & White Stripes
• BG790
• Note: G658056 Counter Weight REQUIRED
• 1-3 Week Lead Time See More Details$613.00 -
LiftMaster MA025 Barrier Arm - Padded Aluminum / 12'GD# LFM-ma025 MFR# MA025• 12'
• Aluminum
• Yellow Padding
• Requires MA031 Adapter Collar
• 1-3 Week Lead Time See More Details$230.75 -
FAAC JPF275 116120 Fixed Bollard Mounting FrameGD# FAC-116120 MFR# 116120• Fixed Bollard Mounting Frame
• For J275/600F and J275/800F Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$288.25 -
DoorKing 1601-092 Heater Kit - 115VACGD# DKS-1601-092 MFR# 1601-092• Use if temperature routinely falls below 10°F (-12°C)
• For 1601-380 / 1601-381
• 3-5 Day Lead Time See More Details$210.00 -
DoorKing 1601-093 Fan KitGD# DKS-1601-093 MFR# 1601-093• Recommended For Hot, Humid Environments
• Compatible with: 1601, 1602, 1603
• 3-5 Day Lead Time See More Details$210.00 -
DoorKing 1601-270 Manual Crank KitGD# DKS-1601-270 MFR# 1601-270• For Use With DoorKing 1601, 1602 & 1603 Without DC Convenience Option
• 3-5 Day Lead Time See More Details$214.50 -
Doorking 1602-041 Arm Hardware Kit - Wishbone WoodGD# DKS-1602-041 MFR# 1602-041• Hardware Kit for Wooden Wishbone Arm
• 3-5 Day Lead Time See More Details$720.00 -
FAAC 390992 Kit for Connecting Barrier Arm LightsGD# FAC-390992 MFR# 390992$50.75
-
FAAC 390993 Barrier Arm Lights 26' (11M)GD# FAC-390993 MFR# 390993$148.75
-
LiftMaster MA201 Heater - 150 WattGD# LFM-ma201 MFR# MA201• 150 Watts
• Maintains a suitable temperature inside a control enclosure
• For temperatures below 32 degrees F
• Compatible with operators MSL, MA, and MAS
See More Details$222.50 -
LiftMaster UN201 Heater - 500 WattGD# LFM-un201 MFR# UN-201• 500 Watts
• Maintains a suitable temperature inside a control enclosure
• For temperatures below 32 degrees F
• Compatible with operators MSW, MSLX, MAT, and MAST
See More Details$275.50 -
MMTC TSM-1 Mounting HardwareGD# MTC-tsm-1 MFR# TSM-1• Mounting Hardware for TS-1 and TS-LED See More Details$139.90
-
Platinum Access SPRD38 Spring - RedGD# PAS-sprd38 MFR# SPRD38• Red Spring for BP19
• Arm Length of 11' - 18' See More Details$135.50 -
FAAC JH275 116200 Bollard Pit HeaterGD# FAC-116200 MFR# 116200• Bollard Pit Heater
• To extend operation down to -13° F (-25° C)
• For J275/600 HA and J275/800 HA Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$576.00 -
FAAC JC275 116201 Bollard Pit CoverGD# FAC-116201 MFR# 116201• Bollard Pit Cover
• For J275/600 HA and J275/800 HA Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$266.00 -
FAAC 116501 Bollard Pit HeaterGD# FAC-116501 MFR# 116501• Bollard Pit Heater
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$629.00 -
FAAC 116502 Release Kit w/ Pressure SwitchGD# FAC-116502 MFR# 116502• Solenoid Valve & Pressure Switch
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$545.00 -
FAAC 116503 Acoustic BuzzerGD# FAC-116503 MFR# 116503• Acoustic Buzzer
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$66.25 -
FAAC 116504 LED Light KitGD# FAC-116504 MFR# 116504• LED Light Kit
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$142.00 -
DoorKing 1603-168 Traffic Spike - Drive Extension / 18"GD# DKS-1603-168 MFR# 1603-168• Drive Extension
• 18"
• REQUIRED to connect the operator to the spike sections
• 3-5 Day Lead Time See More Details$920.00 -
DoorKing 1603-170 Traffic Spike - Tunnel Extension / 18"GD# DKS-1603-170 MFR# 1603-170$866.00
-
DoorKing 1610-010 Spike Lock Down Handle - Surface MountGD# DKS-1610-010 MFR# 1610-010• Spike Lock Down Handle - Surface Mount
• 3-5 Day Lead Time See More Details$245.25 -
DoorKing 1610-012 Spike Lock Down Handle - Flush Mount w/ Spring RetractionGD# DKS-1610-012 MFR# 1610-012• Spike Lock Down Handle - Flush Mount w/ Spring Retraction
• 3-5 Day Lead Time See More Details$71.25























