Porta-King Model 4848SW 4'x4' Pre-Made Booth

Porta-King Pre-fabricated Guardhouse Photo
• Duraluminum Building
• Building Base: 4848
• Interior Height: 90"
• Exterior Roof, 3" Overhang
• Swing right-hand door with glass - Clear anodized aluminum finish
• ADA Hydraulic Door Closer
• ADA Lever Entry Lockset
• Clear Tempered Safety Glass
• Aluminum Treadplate Floor
• Standard Floor Access Cutout
• 100A, 1Phase, 12 Circuit Load Center w/Main Breaker
• Duplex 115V and Single 230V Standard Outlet
• Wall Switch
• 34 Watt T-8 Fluorescent Fixture
• Standard Walnut Woodgrain Shelf - 22' d x full width
• UL Lable for compliance with the NEC
  Porta-King QS-4848 Pre-Made Booth
$6,500.00
Call for Freight
  Optional 230V, 9,900 BTU Cool - 11,600 BTU Heat Thru Wall HVAC with Framed Cut Out
$1,600.00

Installation Suggestions:

  1. Pour concrete island minimum 4” deep.  The island should be a minimum of 12” wider than the roofline dimensions to allow a 6” concrete border on each side of the building roofline.  Level the pad and install a bollard at each corner of the building to further protect the building from damage caused by traffic.
  2. Provide three-wire 240v/110v single-phase service to the concrete island.  Refer to PKBS detail drawings, which illustrate the proper “stub-up” location (http://www.portaking.com/preassemb/techinfo.htm ).
  3. Buildings arrive via flatbed truck.  The trucker must contact you 24-hours prior to deliver to arrange for off-loading.  Use either a forklift truck (with fork-extensions when required) or overhead crane to off-load the building from the flatbed.  If an overhead crane is used, be sure to use “spreader bars” to prevent the building fascia/roof from being damaged by the sling/straps.  Square the building on the pad and anchor.
  4. Recommended concrete anchor is ½” x 4” galvanized or stainless steel, or comply with local codes – whichever is most stringent.
  5. Make final electrical connections and clean the work area.
  6. If downspouts are included with your building, they must be installed by others on site.
  7. Light bulbs are not included and must be provided on site, by others.

 

NOTE:  Unless otherwise noted, all preparatory and installation work
shall be performed by others.  It is NOT the responsibility of Porta-King or GateDepot.com to verify
that these “suggestions” comply with local or state codes, rather, it is the
responsibility of the purchaser of the building.